![](https://tecnico.ulisboa.pt/files/2023/03/https-backoffice.tecnico.ulisboa.pt-pt-noticias-campus-e-comunidade-primeira-central-em-funcionamento--40x22.jpg)
Técnico’s first photovoltaic power plant is already operating
The structure was installed on the rooftop of the Civil Engineering building in early 2023 and started to operate on March...
The structure was installed on the rooftop of the Civil Engineering building in early 2023 and started to operate on March...