
Civil engineering students build a beer crate bridge for the third year in a row
The seven-metre span and five-metre-high structure is made up of around 600 beer crates....
The seven-metre span and five-metre-high structure is made up of around 600 beer crates....
Maria Margarida Barriga, Mariana Gameiro and Eduardo Rodrigues, finalists in the Master’s programme in Civil Engineering at Instituto Superior Técnico, are...
Fórum Civil coordinated the activities held at Alameda campus, from February 26 to March 1. ...
The structure was built as part of the 'Under Construction' event, organised annually by the Fórum Civil....
The Civil Engineering Seminar Series took place from 27th February to 3rd March, at Técnico - Alameda Campus, and included construction...