
Sustainability at Alameda campus – the building rooftops will be renovated by the end of the year
The solar panels installed will have a production capacity equivalent to 11.3% of the campus' consumption in 2022....
The solar panels installed will have a production capacity equivalent to 11.3% of the campus' consumption in 2022....
The structure was installed on the rooftop of the Civil Engineering building in early 2023 and started to operate on March...